waste heat for use in other essential
farm operations.
Initially, the farm had used anaerobic
lagoons to break down, process and
treat the waste. Recently, the lagoons
were replaced with a new, two-stage
biogas digester that improves the quality of treated waste. One of the primary
byproducts of the process is digester
gas, with a composition of about 60%
methane and 40% carbon dioxide.
At present, the power plant is operating at full rated load. Forty percent of
the electricity it generates supplies all of
the farm’s electrical needs, including
powering the mill that processes pel-letized feed for the animals and a cool
cell ventilation system for the barns.
The excess electrical output is sold to
the grid, an additional benefit for the
owners in a country with some of the
highest electricity costs in the region.
The farm maximizes the engine’s effi-
ciency by utilizing the hot water recov-
ered from the engine jacket and high-
temperature intercooler circuits to sup-
ply heat where needed. About 30% of
the hot water is circulated through
plates in the floor of the building,
which houses newborn piglets, to pro-
vide consistent heat. This, in turn,
improves the young animals’ health
and reduces mortality among them.
Sixty percent of the heat goes to the
feed mill boiler, which produces steam
for the pelletizing process. Plant opera-
tors estimate that using engine heat
saves them about US$100/hr in energy
costs when the boiler is operating.
About 30% of the hot
water is circulated
through plates in the
floor of the building,
which houses newborn
piglets, to provide a con-
sistent heat. This, in turn,
improves the young ani-
mals’ health — reducing
the mortality rate.
The gen-set was supplied by Entec
Services Ltd., Waukesha’s Auckland,
New Zealand-based distributor. The
gen-set was pre-packaged with a dump
heat radiator, PLC controls, switchgear
panel and heat recovery equipment in a
modified 12 m shipping container for
easy installation on-site. On-site, the
plant required only a fuel gas source,
electrical and water connections.
Entec equipped the gen-set with an
operator panel for on-site and remote